Renewal of Tisza railway bridge, Szolnok (Szolnok-Szajol railway line)

  • Implementer:
    KÖZGÉP Zrt., konzorciumvezető
  • Execution time:
    2014.

Replacing the ’old’ steel double track railway bridge with two new built single track railway bridges

Contractor: KÖZGÉP Zrt., consortium leader

Steel structure: 

Old bridge: ~2200 t

New bridges: 2 x 1300t

Awards: ECCS Brige Design Award, Award of Merit

 

Activities

Gallery